|
 |
 |
| |
| |
| Name: |
SABTEL |
| Location: |
Moscow, Russia |
| Client: |
SABTEL AD |
| General Contractor: |
SEZAM Ltd – Moscow office |
| HVAC Contractor: |
AIRCO Engineering & Trading
Ltd |
|
|
| |
| |
Air conditioning and ventilation
of 2500 sq. meters, six storey building equipped
with satellite telecommunication and cable TV
equipment. |
|

| |
- Installation and commissioning of HVAC equipment
was to be performed without disturbing the operation
of existing electronic equipment.
- Short completion date (45 days).
- Precision air conditioning for rooms with
high thermal loading - cooling was required
at outdoor temperature of -10°C.
- Stand by capacity required minimum 30% and
maximum 50% of total required cooling capacity.
- Selecting equipment which operation would
not disturb the operation of radio diffusion
electronic equipment.
|
|

| |
- HVAC Mechanical and Control Systems engineering
and designing.
- HVAC material and equipment selection and
supply.
- HVAC IOM Documents compiling.
- HVAC SAT Procedures compiling.
- HVAC Commissioning supervision.
|
|
|
|