Major Projects

Reference Project 01

Reference Project 02

Reference Project 03

Reference Project 04


  Reference Project o3
 
 
Name: SABTEL
Location: Moscow, Russia
Client: SABTEL AD
General Contractor: SEZAM Ltd – Moscow office
HVAC Contractor: AIRCO Engineering & Trading Ltd
 
 
  Project task:
 

Air conditioning and ventilation of 2500 sq. meters, six storey building equipped with satellite telecommunication and cable TV equipment.


 
  Specific requirement:
  • Installation and commissioning of HVAC equipment was to be performed without disturbing the operation of existing electronic equipment.
  • Short completion date (45 days).
  • Precision air conditioning for rooms with high thermal loading - cooling was required at outdoor temperature of -10°C.
  • Stand by capacity required minimum 30% and maximum 50% of total required cooling capacity.
  • Selecting equipment which operation would not disturb the operation of radio diffusion electronic equipment.

 
  AIRCO scope of work:
  • HVAC Mechanical and Control Systems engineering and designing.
  • HVAC material and equipment selection and supply.
  • HVAC IOM Documents compiling.
  • HVAC SAT Procedures compiling.
  • HVAC Commissioning supervision.
   
© Airco Ltd. & Xemicomputers info@airco-ltd.com